When a power, water, gas or communication line is being laid, the trench stays open for days. On either side there are homes, shops, schools and bus stops — people do not stop crossing; they simply cross somewhere worse.
On site the gap is usually bridged with whatever is at hand: a plank, a pallet, two pieces of formwork stacked on top of each other. None of these are designed for pedestrian loads; they become slippery when wet, flex in the middle and slide off the edge into the trench.
The TULUX safety crossing bridge is made for exactly this need. It sits over the trench and transfers the load to both sides; with its anti-slip platform, removable handrail and ramped edges, it leaves nothing about the crossing to chance. When the work is done it is lifted out and moved to the next trench.
Each part answers a risk observed on site. Hover over the markers.
The bridge is produced in a single size — the same product everywhere, with no choice to make on site.
* The bridge is manufactured in this single size only. With a platform length of 170 cm it bears safely on the firm ground either side of the trench to be crossed.
No tools required. The bridge is unfolded, positioned and the handrail fitted.
Pick the place where pedestrian flow naturally concentrates — a shop entrance, a bus stop, the line of a pedestrian crossing. Setting the bridge perpendicular to the flow stops people walking along the trench and crossing further away.
Make sure the ground on both sides of the trench is firm and level. Compact any loose backfill; if the edge has slumped, set the bridge further back from it.
Lower the platform so that it bears fully on both sides and check that the ramped edges meet the ground. Fit the handrail into its sockets, secure it and check by hand that there is no movement.
Guide the approach with barriers and tape, and add a warning light for night-time. Keep the remaining open sections of the trench covered.
Pedestrians will not wait for the trench. They either find a safe crossing or improvise one.TULUX · safety crossing bridge
A gap closed with a plank creates new risk every day until the work ends. A bridge built for the purpose closes that risk once.
Head officeTurgut Özal Mah. 1443. Sok. No: 11
Şehzadeler / Manisa · Türkiye
FactoryHarmandalı Mah. Çakal Azamak Sok. No: 5
Şehzadeler / Manisa · Türkiye
+90 532 646 02 67
+90 532 231 86 14
+90 236 236 23 43